Three bills of materials pretending to be one
Engineering, process and production each need a different view of the same product. There is one BOM, so aligning them means rewriting drawings that did not need to change — and the engineering office absorbs it.
so every change means redrawing
« Aligning the engineering and production BOMs forces pointless drawing updates that overload the engineering office. »
How do you answer that today?
One structure, three views. Each discipline reads what it needs.
